Courses

ERP Training: ERP/SAP-FICO, ERP/SAP-SD, ERP/SAP-MM, ERP/SAP-HR, ERP/SAP-PP, ERP/SAP-ABAP, ERP/SAP-BASIS, ERP/SAP-SECURITY, ERP/SAP-SCM, ERP/SAP-CRM, ERP/SAP-NETWEAVER SECURITY, ERP/SAP-XI, ERP/SAP-APO, ERP/SAP-ENTERPRISE PORTAL, ERP/SAP-MM/WM, ERP/SAP-BW / BI, ERP/SAP-SOLUTION MANAGER, ERP/SAP-VARIANT CONFIGURATION (VC), ERP/SAP-IS RETAIL,  ERP/SAP-QM.

ERP/SAP APO
APO Demand Planning (DP)
  - Introduction to ERP 
  - ERP Concepts 
  - SAP as ERP 
  - SAP R/ 3 Architecture 
  - SAP R/ 3 Vs New Dimension Products 
  - APO Architecture 
  - Supply Chain Management Concepts 
  - APO Architecture 
  - APO Modules 
  - APO Integration with SAP R/ 3 and BW 
  - Data warehouse Concepts and SAP BW 
  - SAP BW Architecture 
  - Administrator Workbench Tools 
  - Modeling 
  - Data Extractions 
  - Business Content 
  - Business Explorer 
  - Demand Planning Overview 
  - DP Architecture 
  - DP Integration with other APO modules 
  - InfoCubes 
  - Administrator workbench 
  - InfoCube definition and Creation 
  - Settings to load data to InfoCubes 
  - Demand planning Components 
  - Planning Object structures 
  - Characteristic Value Combinations 
  - Storage Bucket profile 
  - Time Bucket profile 
  - Planning Areas 
  - Planning books and Macros 
  - Definition of planning books 
  - User defined planning views 
  - Advanced Macros 
  - Default, start, exit macros 
  - Alerts 
  - Interactive planning 
  - Loading History data from InfoCube to Planning Area 
  - Selection IDs 
  - Navigation within the planning table 
  - Fixing of values 
  - Aggregation and Disaggregation Calculation types 
  - Pro-rata 
  - Based on another key figure 
  - Average of key figures 
  - Average at lowest level of detail 
  - No disaggregation 
  - Pro-rata except for initial disaggregation 
  - Forecasting techniques 
  - Univariate forecasting 
  - Multi linear regression (MLR) and casual analysis 
  - Composite forecasting 
  - Consensus Based forecasting 
  - Forecast profile 
  - Promotions and Lifecycle planning 
  - Promotion planning 
  - Lifecycle Management 
  - LIKE modeling 
  - Mass processing 
  - Macro calculation in the background 
  - Forecast in the background 
  - Release of DP data to SNP 
  - Transfer of DP data to the R/ 3 
  - Data Maintenance and Administration 
  - Data Realignment 
  - Generate Export Data sources Demand Planning Backup 
  - Reporting on Live Cache data Using Data Marts and Remote Cubes
APO Supply Network planning (SNP)
  - Overview of SNP
  - Supply Chain planning process
  - Role of SNP in APO Planning
  - SNP Planning methods
  - Roles of Deployment and TLB
  - Integration with execution system
  - Network Design
  - Objectives of Network design
  - Decisions of Network design
  - Planning methods
  - Configuration and parameters
  - Technical Aspects of APO
  - Technical Link Between APO and R/ 3
  - LiveCache Technology
  - LiveCache vs. Database
  - RFC Destinations
  - Core Interface
  - Integration Models
  - tRFC, Inbound and Outbound queue
  - Authorizations for Planning Objects
  - Performance Tuning
  - Object Transportation
  - Master data for SNP
  - Locations
  - Products
  - Resources
  - Calendars
  - Production process Models
  - Transportation Lanes
  - Lot size, SNP supply and Demand Profiles
  - Integration of APO master data and R/ 3 
  - SNP Configuration
  - Planning Object structures
  - Planning Areas
  - Planning Books
  - Macros
  - Planning Table
  - Integration with DP
  - The SNP Heuristic
  - SNP Heuristic Run
  - Capacity check
  - Capacity leveling
  - What-if Scenarios
  - Capable to Match
  - CTM Process Overview
  - Master data for CTM and Configuration
  - CTM Planning run
  - Optimization in SNP
  - Optimization constraints
  - Costs for controlling the Optimizer
  - Configuration of SNP Optimizer
  - Safety stock planning
  - Safety stock planning in the network
  - Standard methods
  - Advanced methods
  - Uncertainty of Demands
  - Uncertainty of receipts
  - Deployment
  - Deployment concepts
  - Configuration of deployment
  - Fair share and push rules
  - Heuristic and Optimizer
  - Transport Load Builder (TLB)
  - TLB s Key components
  - TLB Configuration
  - TLB Run
  - Consolidated load building in TLB
  - Project Scenarios
  - System Landscape
  - Integration with BW and R/ 3
  - Implementation Methodologies
  - SAP Projects (Implementation, Support, Rollouts, Upgradation)
  - Customization 
  - Real-time issues and Case study


The courses are indicative in nature subject to changes as per market requirements.